On the inside, the Plumbing, HVAC, and Electrical rough-in are all moving right along. The plumbing rough in is pretty well complete until after drywall and cabinets. Both furnaces are set in place and ductwork runs have started, all of the electrical boxes are located, and the rough in wiring is being pulled. Here are Pearson and Shelly standing in front of the boys bathtub upstairs.
A few other details are starting to take shape, too. Here you can see the framing for one of Shelly's favorite features, the two-sided fireplace between the Master Bedroom and the Master Bath Whirlpool tub.
And here are the columns in the Great Room/Dining Room/Kitchen.
No comments:
Post a Comment