Jake showing off the primer in his bedroom.
Welcome to the Prifogle House Building Blog! This is our family's project to purchase an old house, tear it down, and to build our new house from the ground up from the design and demolition to the final touches and moving in. Tune into this blog and on a weekly basis (we hope to post 2 to 3 times a week) and you can see our progress, our frustrations, and ultimately our new house!
Wednesday, December 29, 2010
Monday, December 27, 2010
Friday, December 17, 2010
Drywall is all hung, now tape and mud
Garage still looks big after drywall.
Bedroom/Master Bath pass through fireplace
Great Room Fireplace
Saturday, December 4, 2010
Sunday, November 28, 2010
Saturday, November 27, 2010
Thursday, November 11, 2010
Exterior Paint and Shingles
Sorry for the slow down in updates. With Daylight Savings time kicking in, it's getting harder and harder to get up to the lot after work before dark. A lot has happened since last post. On the outside, the siding is complete and painting is well on its way. The shingles also started going on today. We decided to go with Olive Grey as our primary color with off-white trim.
On the inside, the Plumbing, HVAC, and Electrical rough-in are all moving right along. The plumbing rough in is pretty well complete until after drywall and cabinets. Both furnaces are set in place and ductwork runs have started, all of the electrical boxes are located, and the rough in wiring is being pulled. Here are Pearson and Shelly standing in front of the boys bathtub upstairs.
A few other details are starting to take shape, too. Here you can see the framing for one of Shelly's favorite features, the two-sided fireplace between the Master Bedroom and the Master Bath Whirlpool tub.
And here are the columns in the Great Room/Dining Room/Kitchen.
On the inside, the Plumbing, HVAC, and Electrical rough-in are all moving right along. The plumbing rough in is pretty well complete until after drywall and cabinets. Both furnaces are set in place and ductwork runs have started, all of the electrical boxes are located, and the rough in wiring is being pulled. Here are Pearson and Shelly standing in front of the boys bathtub upstairs.
A few other details are starting to take shape, too. Here you can see the framing for one of Shelly's favorite features, the two-sided fireplace between the Master Bedroom and the Master Bath Whirlpool tub.
And here are the columns in the Great Room/Dining Room/Kitchen.
Wednesday, November 3, 2010
Wednesday, October 27, 2010
Monday, October 25, 2010
Roof and second floor are well on their way
It's really starting to look like the final product now. First floor framing is basically complete. Second floor rooms are roughed in and the roof is starting to go on. The roof trusses should be delivered later this week. We ordered the garage doors today, too!
Thursday, October 21, 2010
First floor framing mostly complete, they started on the second floor today
Outdoor kitchen patio.
Shelly and Pearson standing in the front door opening.
Shelly showing off her huge walk in closet.
P likes the way the new house is coming along.
Stairwell upstairs from the Great Room.
View of the kitchen and nook from the top of the stairs.
Fireplace
Entryway and Dining Room from the Great Room
Monday, October 18, 2010