Wednesday, January 26, 2011

Fireplace Stone is Laid, Tile Floors are Going Down

Stone is in for the Fireplace!

The back of the second island finally came in.

Master Shower tile is grouted.

We went with this 12" x 24" tile in our Master Bath.

The mason finished the exterior columns while he was over to do the Fireplace.

Thursday, January 20, 2011

Wood Trim Stain and Master Shower Tiling

Another kitchen cabinet shot.

Master Bedroom fireplace stained.

Shelly's closet dresser stained.

One of the interior columns.

First coat of stain on the Staircase.

Close up of the tile in the Master Shower.

Tuesday, January 11, 2011

More Trim Carpentry

Interior Columns trimmed out with wood.

Mudroom bench with cubbies.

Master Fireplace trimmed out and ready for stone. The temporary mantle is in place until the stone goes in, then will be replaced with a piece made by the cabinet guy.

Pearson taking a break on the bench in front of the Master Bedroom/Bathroom pass through fireplace.

Saturday, January 8, 2011

Trim Carpenter continues to amaze us!

This staircase is a good example of why the Trim Carpenter, Pete, is my favorite contractor,

And the start of Shelly's closet is a great example of why Pete is her favorite contractor. Pearson apparently gives him the thumbs up, too.

Garage Door Openers getting installed today.

View of the stone work on the exterior kitchen/porch.

Wednesday, January 5, 2011

Sunday, January 2, 2011