Sunday, November 28, 2010

Thursday, November 11, 2010

Exterior Paint and Shingles

Sorry for the slow down in updates. With Daylight Savings time kicking in, it's getting harder and harder to get up to the lot after work before dark. A lot has happened since last post. On the outside, the siding is complete and painting is well on its way. The shingles also started going on today.   We decided to go with Olive Grey as our primary color with off-white trim. 



On the inside, the Plumbing, HVAC, and Electrical rough-in are all moving right along.  The plumbing rough in is pretty well complete until after drywall and cabinets.  Both furnaces are set in place and ductwork runs have started,  all of the electrical boxes are located, and the rough in wiring is being pulled.  Here are Pearson and Shelly standing in front of the boys bathtub upstairs.


A few other details are starting to take shape, too.  Here you can see the framing for one of Shelly's favorite features, the two-sided fireplace between the Master Bedroom and the Master Bath Whirlpool tub.


And here are the columns in the Great Room/Dining Room/Kitchen.



Wednesday, November 3, 2010

Exterior Siding Started Today



Interior of Garage-ma-hal

Master Bath drop-in tub framing.